This page does not seem to exist…
We apologize for the inconvenience, but the page you were trying to access is not at this address. You can use the links below to help you find what you are looking for.
If you are certain you have the correct web address but are encountering an error, please contact the Site Administration.
Thank you.
You might have been looking for…
- (Kodzoman) Restoration of the Prespa Lake Ecosystem (implementation of the Prespa Lake Watershed Management Plan)
- A presentation by Anita Kodzoman (UNDP) during the Inception Meeting of the Preparation Phase of the GEF project
- Status paper part 1
- Status Paper on the Management of the extended Transboundary Drin Basin
- Status paper part 3
- Status Paper on the Management of the extended Transboundary Drin Basin
- BackgroundPaper_DiscussionStructure_NCMAlbaniaTirana.pdf
- (Oruc) Integrated Ecosystem Management in the Prespa Lakes Basin -Transboundary Project
- A presentation by Yesim Oruc during the Inception Meeting of the Preparation Phase of the GEF project
- List of Participants
- For the Inception Meeting of the Preparation Phase of the GEF project
- NCMOhrid_21110_Report.pdf
- NCMTirana_050410Report.pdf
- Status paper part 4
- Status Paper on the Management of the extended Transboundary Drin Basin
- BackgroundDocument_DrinTCMTirana251111.pdf